HOME  »  Gorre and Daphetid Railroad - The Slides » Set_00 »  Viewing s0_022_scalp_july59     [Image 22 of 108]  :: Jump To  
  First slide Previous slide      Index Page Start/Stop the slide show      Next slide Last slide  
Comment: Sim’s Loop and Texas Draw scenery about finished. Note 'Nika' at upper right.
s0_017_const_unkdate * The Engine Terminal at Great Divide with the stock pen. Peter, April 58? * 3072 x 2048 * (1.7MB)

s0_018_25_April58 * Sim’s Loop tunnel and the small bridge. * 3072 x 2048 * (2.38MB)

s0_019_mirror_unk58 * Great Divide yard – some structures temporarily resting at the right. Double slip switch not yet built. * 3072 x 2048 * (1.86MB)

s0_020_levels_july59 * Angels Camp, Sowbelly, and Daphetid (on right). Note the abandoned tunnel with the wood portal. * 3072 x 2048 * (2.12MB)

s0_021_perspective_july59 * View from above Daphetid looking toward Cross Jct. with the first depot at the Jct. The clock is in place. * 3072 x 2048 * (2.48MB)

Click for the original image
 
s0_022_scalp_july59.jpg - 3072 x 2048 - (1.82MB)
Download file (1.82MB)
8/8/06 2:49 AM
s0_023_bridge_july59 * View down Sowbelly Creek (?) from the aisle. Future logging scene on spur at lower right. * 3072 x 2048 * (2.27MB)

s0_024_teaby_unk59 * East end of Gorre – Oil drilling rig at Sowbelly is just below the through truss bridge. Daphetid at left * 3072 x 2048 * (2.33MB)

s0_025_crevas_unk59 * Working hard with plenty of smoke pulling upgrade on the 3.5 percent dual gauge just east of Squawbottom. * 3072 x 2048 * (1.66MB)

s0_026_roundconst_july59 * From Port looking toward Angels Camp. The harbor bridge is now two tracks wide. * 3072 x 2048 * (2.32MB)

s0_027_mountains_may61 * Looking up Devil’s Gulch. Sims Loop small bridge and tunnel on left. * 3072 x 2048 * (2.14MB)

Album last updated on 8/16/06 7:35 PM
"John Allen's Gorre and Daphetid Railroad" Copyright 2006 Peter T. Prunka all rights reserved