HOME  »  Gorre and Daphetid Railroad - The Slides » Set_02 »  Viewing s2_040_backcorner_unkdate     [Image 40 of 40]  :: Jump To  
  First slide Previous slide      Index Page Start/Stop the slide show      You have reached the last slide You have reached the last slide  
Comment: Looking NW in July of 1956 at the site of Scalp Mountain (foreground) and Devil’s Gulch.
s2_035_bridge_july59 * Gas electric #60 again as it crosses Squawbottom Creek near Cross Junction, which can be seen at the right. Angel’s Camp is at the top of the picture. 6-59 * 3072 x 2048 * (2.32MB)

s2_036_b4squaw_may63 * Squawbottom Station as it looked in May of 1963. High above to the right is the town of Akin. * 4224 x 2848 * (4.15MB)

s2_037_greatdivide_jun65 * The Great Divide yard and passenger station. Note the clever use of a mirror to enlarge the yard. 6-65 * 4280 x 2904 * (4.21MB)

s2_038_superior_jul71 * The train must be late at the G&D station, judging from the passengers and baggage on the platform. 7-71 * 4280 x 2896 * (4.29MB)

s2_039_metalbridge_sep64 * The Port Plastic Complex is just in the beginning stages of construction in this September, 1964 scene. * 4272 x 2912 * (3.86MB)

Click for the original image
 
s2_040_backcorner_unkdate.jpg - 3072 x 2048 - (1.68MB)
Download file (1.68MB)
8/9/06 11:09 AM
Album last updated on 8/16/06 7:36 PM
"John Allen's Gorre and Daphetid Railroad" Copyright 2006 Peter T. Prunka all rights reserved